Primary:
- Finish caulking windows – done
- Trim the North sacristy closet door – done
- Repair hinges on the North door to the deck – done
- Cut sheeting to line the closet in the bell tower
- Install the sheeting in the closet
- Install a new mortised lock and handle on the bell tower door – done
- Remove the rotted sill wood between the bell tower and the church entrance – done
- Install new wood and a drip edge – done
- Organized extra Icons to be hung in the church
- Clear out the snow shovels and salt buckets and stow the snow blower for next season
Secondary:
- Check furnace filters in the church and hall furnaces.
- Cut and install sheeting for crawl space above hall ceiling
- Measure bell tower windows
- Measure sacristy windows
- Prep the sacristy closet walls for painting
- Install wiring and fixture to light the wood loft above St. Josephs Shop
- Run electrical wire to the bell tower for power
- Rewire the garage door opener in the garage
All volunteers (parishioners, friends, neighbors) are welcome to share their talent with us.